Works Overview

This project had differing requirements for each of the two constructed stormwater ponds. Lake A required inlet structures be screened and that an open area of water be retained to facilitate recreational activities on the lake. Lake B required a denser vegetation coverage. In addition to this was the need to maintain unobstructed views across both lakes.
Wetland Solutions completed this project on time and within budget.
Works included:
- Planting Plan
- Plant supply (3990)
- Planting
- 12 months maintenance
Background
As part of the Cooks Beach subdivision two large lakes had been designed to treat stormwater run off as well as being aesthetically pleasing and of value to the local residents.
Purpose
- To meet the Resource Consent requirements for the subdivision development.
- To allow for the use of recreational activities.
- To be a visually appealing landscape feature of the subdivision.
Scope
- Stage 2 - Plant supply and planting
- Stage 3 - 12 months maintenance

Pre-planting
|

2 Months Post-planting |

10 Months Post-planting
|