Project: Longford Park Pond Upgrade
Client: Papakura District Council
Contract: Pond Upgrade
Location: Longford Park, Papakura
longford_park.jpg



Works Overview

wetland_planting.jpgWetland Solutions was able to complete this project on-time and within budget. The project underlines the benefits of implementing a wetland planting when conditions are better suited to wetland plant establishment.

Works included:

  • Weed control
  • Supply and spread mulch (276m³)
  • Plant supply (7,902)
  • Planting & maintenance

Background

Longford Park Pond plays a key role in trapping sediments contained in stormwater run-off from the surrounding new housing and road catchment areas.

Stormwater sediment control ponds generally require maintenance every 15 – 20 years; this requires the excavation/removal of sediments and re-planting.

 

Purpose

  • The project was designed to facilitate the maintenance up-grade of an existing 15 year old sediment control pond and public amenity.

  • Newly constructed forebays with planted deep and shallow zones improves the retention of sediments.

 

 

Scope

  • Stage 1 – weed control, spread bark mulch and establish the associated riparian and amenity plantings during the winter of 2004.

  • Stage 2 – aquatic weed control and establish the wetland planting during the spring/summer of 2004/05.

  • Ongoing maintenance – ecological weed control and plant replacements.

 

 

before_development.jpg during_planting.jpg post_planting.jpg
Before
During
After

 


Click here to return to the projects page


Our History

Wetland Solutions, established 2003, are recognised as industry leaders in Ecology and Environmental Consulting.

Find out more >
 
1  5WATERNZ-LOGO
2  
3   NZECOLOGO

 
phone0800 W E T L A N D
0800 938 526

info@wetland.co.nz


fb