Works Overview

Wetland Solutions was able to complete this project on-time and within budget. The project underlines the benefits of implementing a wetland planting when conditions are best suited to wetland plant establishment.

Works included:

  • Weed control
  • Supply and spread mulch (276m³)
  • Plant supply (7,902)
  • Planting & maintenance

Background

Longford Park Pond plays a key role in trapping sediments contained in stormwater run-off from the surrounding new housing and road catchment areas.

Stormwater sediment control ponds generally require maintenance every 15 – 20 years; this requires the excavation/removal of sediments and re-planting.

Purpose

The project was designed to facilitate the maintenance up-grade of an existing 15 year old sediment control pond and public amenity.

Newly constructed forebays with planted deep and shallow zones improves the retention of sediments.

Scope

Weed control, spread bark mulch and establish the associated riparian and amenity plantings during the winter.

Aquatic weed control and establish the wetland planting during the spring/summer.

Ongoing maintenance, ecological weed control and plant replacements.

 

Click here to return to the projects page

Our History


Wetland Solutions, established 2003, are recognised as industry leaders in Ecology and Environmental Consulting.

Find out more >

 
 

Find Us

 
fb1
 
li1

 
 

Contact Us

 
0800 W E T L A N D
0800 938 526
 
1-979
2-367
 

Auckland Council 2014(copy)(copy)(copy)-967
 

3-31-953
 

SS-LogoMember-Long-RGB - small-648

4-23

WATERNZ-LOGO
5-502